The new facility will be built in the same location, 138 S. Josephine Tobin, and will be approximately 9,500 square feet or roughly twice the area of the original. Douglas Architects, the design firm, met with the Design Review Committee of the HDRC on January 22 to get feedback on its concept. Suggestions included incorporating the brick from the existing structure into the new proposed chimney element and integrating similar design details and elements, according the city staff report…